When we are use the high-strength cement production line, we can not patronize to use machine, there are some small details that we need to pay attention, and carefully study what we should pay attention.
1, in the use of time must pay attention to its storage, management, especially when it is transported, do not let it damp. In some rainy weather, when the shipment, but also pay attention to try not to let the car below the water, and after the shipment of things, to timely cover with a rain cloth. When storing the cement, be sure to put it in a dry place, the purpose is to prevent the cement damp, into small pieces.
2, the machine can not be mixed with other substances used. The main reason for this is because of the quality of cement and performance differences, so when used, will not be integrated, when placed in the time, but also try not to put together, must be used alone. If it is produced by the same manufacturers, different brands of cement, but also can not be used, the reason is the same.
3, in the use of cement, be sure to maintain the principle of the first use. That is not to let the cement storage time is too long, mainly for the product damp, so that the performance of cement and quality decline. It is also important to note that as far as possible not to cement and some other chemical substances together, so mainly to prevent them together there will be some other adverse reactions.
4, the use of cement, it must be configured to a certain percentage of the use. Mainly because cement plant structure is different rely on different from the project, the , so before the use of the best allocation ratio is more conducive to our operations.