Great Wall Machinery has the domestic first-class cement ball mill research and design team, perfect cement mill test and detection means, sophisticated large-scale cement mill manufacturing equipment and manufacturing technology, formed a perfect cement mill test research, design, manufacture, testing and Service system, and with raw materials grinding independent intellectual property rights.
Cement ball mill installation steps are complex, there are many processes, the most important is:
1. Basic acceptance; prepare for equipment installation, carefully examine the ground situation. This is the first process, but also the most basic process.
2. Billet embedded and basic scribing work; for the cement ball mill assembly measurement of good size, which is one of the preparatory work.
3. Check the equipment out of the library; in addition to the equipment for the usual test, but also focus on checking the sliding bearing bearing pad and mill cylinder sliding contact.
4. Install the sliding bearing; first install the base, then tighten the anchor bolts.
5. Assembly and commissioning; installation of sliding bearings, the assembly of other parts to complete, but also a lot of debugging equipment to work in order to carry out grinding operations.
Cement ball mill uses double sliding bearings, with the same specifications of the hollow shaft mill compared to the sliding bearing mill with mill cylinder with high strength, stability, high yield Advantages, it is the main equipment of the entire 1.2 million+ tons of cement grinding line project, so it is very important throughout the process. So the installation must be particularly hard, serious construction, the use of scientific construction methods and advanced technology testing means, strictly to the quality of each installation process, can ensure its high quality and efficient long-term stable work.