For those who want to set up slag production line, you need to first understand what constitutes the production line equipment to ensure the selection of vertical mill models can be applied to the grinding of materials. Second, the installation of the site design process, according to the layout of the production line equipment reasonable arrangements to achieve a simple structure, production line efficiency, based on investment and other standards, it can be called a high-quality slag production line!
To slag powder production line, for example, the production line need to configure vertical mill, dust collector, belt conveyor, electric control equipment, dust removal equipment, non-standard pipelines. Chaeng (Xinxiang City, the Great Wall Machinery Co., Ltd. )as an integrated grinding equipment suppliers, with all models to provide equipment and production line contracting strength. Chaeng has its own vertical mill production base, the production line in the use of equipment factory production, so the stability of the efficiency of the equipment before the operation more understanding, eliminating the instability of the latter part of the performance of customers to worry about! Civil engineering early Chaeng will have experts to visit the base, according to the actual situation, for the customer production line construction to provide a good design and construction projects, as far as possible for the material to create conditions for gravity transport, simplify the transport links of equipment configuration, Simple ideal effect. Chaeng independent production line of vertical mill with low power consumption, stable and reliable quality, low noise, low dust concentration, environmental protection and other significant advantages, by the majority of new and old customers of all ages!
Large vertical mill production line not only test the design and installation of the mill for the mill, but also know how the strength of manufacturers in the end. Chaeng has 50 years of history as an old enterprise, already has a slag powder production line from the feasibility study report, design, equipment selection, manufacturing, installation, commissioning, personnel training and other general contracting capacity building services. GRMK26.31 / 46.41 / 56.61 vertical grinding of cement, GRMR 30.31 / 36.41/63.61 raw material vertical mill and so on, to meet the annual production capacity of GRMS 26.21 / 46.41 / 53.41 grinder vertical grinding, GRMK33.31 / 46.41 / 56.61 Production of 20-100 million tons of mineral powder line construction needs, its overall structure is reasonable, advanced technology, stable and reliable operation, the main technical and economic indicators have reached the international advanced level.