CHAENG (Great Wall Machinery) can undertake 20 tons --1.5 million tons of Blast furnace slag/Steel slag/Nickel slag/Manganese slag powder production line EPC projects. Up to now, CHAENG (Great wall corporation)has constructed more than 100 slag grinding production lines at home and abroad.
The stacked slag is packed and feed by the forklift trucks, then they transported by belt conveyor. During transmission, the slag will pass through the iron separator and vibrating screen, then through the weighing equipment and bucket elevator, finally come into the vertical roller mill. With the hot air form cowper stove, the slag after grinding, it will come through the separator, while drying. Slag meets the fineness requirement will pass through the separator, then delivered by air blower and elevator, finally come to the storage silo.After being processed, steel slag can be used as smelter flux, cement raw material, construction aggregate, foundation backfill, railway ballast, road pavement, brick, slag fertilizer and soil amendment, etc.
Equipments:Jaw crusher, hydraulic cone crusher, vibrating feeder, vibrating screen, magnetic separator, belt conveyor.