CHAENG launched the EPC turnkey service model of the “one vertical mill, eight services” ore powder production line from the pre-project establishment to the final production operation, which is highly favored by customers. Up to now, Xinxiang Great Wall has built more than 100 mineral powder production line projects and accumulated rich experience in project construction.
As we all know, the production line of different production of mineral powder has different footprints. According to the construction experience of the mine powder line project, Xinxiang Great Wall shares the floor space of the mine powder production line with different output for reference only.
Assuming that there is no height difference in the ground level of the production plant, the slag yard considers the reserves of 5-7 days, and the production line covers the following area:
CHAENG mine powder line system is a vertical mill integrated system. The main machine adopts Xinxiang Great Wall energy-saving and environmental protection GRMS slag vertical mill. It integrates crushing, drying, grinding, powder selection and conveying. The layout is compact and the area is about ball milling system. 50%, and can be placed in the open air, reducing investment costs.