300tpd cement production line is the production line composed of a series of cement production equipment, mainly including crushing, prehomogenization, raw material preparation and homogenization, preheating and decomposition, sintering of cement clinker, cement grinding and packing and so on.
CHAENG can provide general contracting of new dry process cement production line from design, manufacturing, installation, debugging and capacity and standard reaching (turnkey project) to customers, helping customers save efforts, energy and start cement production with high efficiency.
CHAENG 300 t/d Cement plant Equipment List:
Raw Material Vertical Roller Mill | 1) Model: Ф2.4×8m 2) Max. feed size: ≤25mm 3) Moisture of finished product: 0.5~1.0% 4) Max moisture of material: 5% 5) Fineness of finished product: 80μmR10~12% 6) Capacity: 30t/h 7) Installed Power:570kw |
Preheater | C1: Ф2570mm C2: Ф2770mm C3: Ф2770mm C4: Ф2940mm Capacity: 300t/d |
Preheater Fan | 1) Type: W6-29No 21.4D 2) Capacity: 100000m3/h 3) Pressure: 7200Pa 4) Power:400kW |
Rotary Kiln | 1) Model: Ф2.8 X 44m 2) kiln pitch: 3.5% 3) rotary speed: 0.375-3.3r/min 4) Capacity: 330t/d 5) Motor Power:90kw |
Clinker Cooler | 1) Type :Ф2.5 X25m 2) Capacity:300t/d 3) Clinker temperature at outlet : ≤100℃ |
Cement Mill | 1) Model: Ф2.4 X 8m 2) Max.feed size: ≤25mm 3) Fineness of finished cement: 3200cm²/g 4) Capacity: 30t/h 5) Installed Power: 570kw |
Packing machine | 1) Type:4RSE 2) Capacity:60 t/h 3) Accuracy:±150g deviation as average of 10 |
Coal Mill | 1) Model: Ф2.2 X 4.4m 2) Max.feed size: ≤25mm 3) Capacity: 8t/h 4) Installed Power: 250kw |