Project capacity: 50TPH
Host Equipment: ball mill
Project Location: Central America
In 2019, a customer from Central America signed a general contracting project with Xinxiang Great Wall Machinery (CHAENG) for a cement grinding plant with an output of 50 tons per hour. The project is currently under construction and is expected to be completed and put into operation in January 2023. The cement grinding plant project is a key project of the local government. After completion, it will become one of the largest cement grinding stations in Central America, meeting the demand for cement in the surrounding markets.
CHAENG CEMENT GRINDING STATION PROJECT IN SOUTH AMERICA
Project Highlights:
1. The advanced grinding and drying process solves the problem of excessive moisture in the feed.
2. The closed-circuit grinding process of ball mill + classifier can well adjust the fineness of cement.
3. Add a cooling process to reduce the cement temperature to below 75 degrees.
4. Online loading and measuring system, which can complete the loading and measuring of cement more intelligently and quickly.
5. The full frame steel structure is connected by bolts, which is convenient for construction and installation, and saves a lot of time and labor costs for customers.