fly-ash,slag, limestone, gypsum,ect.
Vertical Roller Mill Production Line mainly consists of the grinder, dust collector, hot air stove, bucket elevator, feeder, hopper etc.
When it works, raw materials are fed in evenly by the feeder at the bottom of the hopper, then lifted to appropriate height by the bucket elevator, then sent into the mill through feeding pipe to be grinded , the grinded materials are brought into the powder classifier by the hot air generated by the hot air stove, at the same time, the materials are dried and classified , the unqualified materials fall down to be regrind, qualified fine powders are sent into powder collector , and then transported to the storage by the conveyor.
Model | Grinding Table Diameter (mm) | Roller Diameter (mm) | Roller Number (n) | Motor (kW) | Output (t/h) |
---|---|---|---|---|---|
GRMR22.31 | 2200 | 1400 | 3 | 550 | 70 |
GRMR26.31 | 2600 | 1600 | 3 | 790 | 100 |
GRMR28.31 | 2800 | 1750 | 3 | 900 | 115 |
GRMR30.31 | 3000 | 1700 | 3 | 1000 | 120 |
GRMR32.31 | 3200 | 1500 | 3 | 1400 | 160 |
GRMR34.31 | 3400 | 1500 | 3 | 1600 | 180 |
GRMR36.41 | 3600 | 1600 | 4 | 1800 | 200 |
GRMR38.41 | 3800 | 1700 | 4 | 1900 | 230 |
GRMR40.41 | 4000 | 1800 | 4 | 2240 | 260 |
GRMR43.41 | 4300 | 1900 | 4 | 2500 | 310 |
GRMR46.41 | 4600 | 2060 | 4 | 3150 | 350 |
GRMR48.41 | 4800 | 2240 | 4 | 3350 | 390 |
GRMR50.41 | 5000 | 2360 | 4 | 3500 | 420 |
GRMR53.41 | 5300 | 2500 | 4 | 3800 | 470 |
GRMR56.41 | 5600 | 2600 | 4 | 4500 | 540 |
GRMR59.61 | 5900 | 2600 | 6 | 5000 | 610 |
GRMR63.61 | 6300 | 2700 | 6 | 6000 | 720 |
Note: mill spectral pattern benchmark
Vertical roller mills are widely used in the concrete and mining fields,for example, Cement Plant, Clinker Grinding Unit, Thermal Power Plant.
The wide product range enables us to provide our customers with stand-alone machines or complete processing plants. Based on our customers’ request and budget, our experts make efficient, reliable solutions. Following customers’ order we produce strictly, what’s more, before placing the order every customer has the chance to visit XinXiang Great Wall (Chaeng) working machines or complete plant in the site.
To ease the trip for every visitor to China, in particular the first-time visitor, we provide FOR FREE all relevant visitor-friendly services including invitation letter preparation, hotel reservation, airport pick-up, incity transportation, and sightseeing guide, etc.
Experienced technicians guidance is available on the phone, and on the internet. One or more engineers will be dispatched to the quarry site to help install the customers’ plants. Necessary training about machine daily maintenance to local workers is provided also.
After-Sales department is made of well-trained employees and installation engineers, the installation engineers are special and professional members of XinXiang Great Wall (Chaeng), they are now strategically located home and abroad, working for our customers.