450,000 t/a GGBFS Plant

Get solution and support:
I am interested in (*) , raw material is , the production capacity is t/h, send email to (*) . Name: (*) Phone: Country:

Application :                        Cement Plant  Clinker Grinding Unit, Steel Mill
Annual Output :                  450,000 tons
Power Consumption :          40 kWh/t
Blaine Fineness :                  4200-4500 cm²/g

Parameter

Application: Cement Plant Clinker Grinding Unit, Steel Mill

Annual Output: 450,000 tons

Power Consumption: 40kWh/t

Blaine Fineness: 4200-4500 cm²/g

Introduction

ggbs production line.jpgThe GGBS is used to the concrete projects, such as projects involving in roads and bridges, which have higher requirements for bending strength. Meanwhile, the GGBS also suits to make concrete with high strength and high performance .The two advantages following of GGBS make it having great superiority in the big scale concrete projects, underground concrete projects and sea concrete projects.

Advantages

The production line of GGBS used the most advanced vertical mill system up to now. Different with the technology used in the conventional GGBS vertical mill system in the market, CHAENG (Xinxiang Great Wall Machinery Co., Ltd) has innovated many new technology which ensure that the whole GGBS production can operation stably with high capacity, high efficiency ,low carbon.Its new process is mainly the following aspects:

1.Separation of dry material and wet material

2.The outside cycle using bury scraping machine and hauling engine and pipe iron remover combination

3.Set up steady flow storehouse ( middle storehouse )

4.The waster material will be send to the vertical mill going through the outside warehouse

5.Set the dust collector on the chute transportation corridor

6.Using two gate valve to replace 3-way valve which has a high failure rate.

7.The large pieces of slag will be crushed again and again.

8.Add the iron choosing machine to make a better separation effect of slag and iron

9.Other creative industrial technique

clinker production line.jpg

Technology

No. Equipment UNIT Number
  Drying Workshop    
1 Coal Vertical Hammer Crusher set 1
2 Bucket Elevator set 1
3 Screw Gate set 1
4 Coal Feeder set 1
5 Electro-vibrating Feeder set 1
6 Belt Conveyor set 1
7 Air Blower set 1
8 Furnace in Fluid Bed System Unit 1
9 Rotary Drying Machine set 1
10 Dust Collector set 1
11 Exhaust Fan set 1
12 Heat-resisting Feeding Device Unit 1
       
  Raw Slag Warehouse    
1 Bucket Elevator set 3
2 Electro three links Separator Valve set 3
3 Bag Type Dust Collector set 3
4 Material Level Device set 3
5 One Way Screw Gate set 3
6 Belt Weigher set 3
7 Belt Conveyor set 3
8 De-ironing Separator set 3
       
  Grinding  System    
1 GRMS40.41 set 1
2 Bag Type Dust Collector set 3
3 Combustion Flower set 3
       
  Finished Products System    
1 Bag Type Dust Collector set 3
2 Discharged Equipment Unit 3
3 Bulk Packing Machine set 3

Cases

 

  • 1,000 t/d Clinker
  • 2,500 t/d Clinker
  • 3,000 t/d Clinker
  • 4,000 t/d Clinker
  • 5,000 t/d Clinker
  • Production Line Equipments

    a. GRMR22.30 Raw Material Vertical Roller Mill

    b. GRMC12.30 Soft Coal Vertical Roller Mill

    c. φ3.2×48 Rotary Kiln

    d. φ3.8×13 Cement Mill

  • Production Line Equipments

    a. GRMR38.41Raw Material Vertical Roller Mill

    b. GRMC20.30Soft Coal Vertical Roller Mill

    c. φ4.0×60 Rotary Kiln

    d. φ4.2×13 Cement Mill (2 Sets)

  • Production Line Equipments

    a. GRMR40.41 Raw Material Vertical Roller Mill

    b. GRMC22.30 Soft Coal Vertical Roller Mill

    c. φ4.2×60 Rotary Kiln

    d. φ4.2×13 Cement Mill (2 Sets)

  • Production Line Equipments

    a. GRMR48.41 Raw Material Vertical Roller Mill

    b. GRMC23.30 Soft Coal Vertical Roller Mill

    c. φ4.5×66 Rotary Kiln

    d. φ4.2×13 Cement Mill (2 Sets)

  • Production Line Equipments

    a. GRMR53.41 Raw Material Vertical Roller Mill

    b. GRMC26.30 Soft Coal Vertical Roller Mill

    c. φ4.8×72 Rotary Kiln

    d. φ4.2×13 Cement Mill (3 Sets)

Request for Quotation

You can get the price list and a Great Wall representative will contact you within one business day.

Name:
Phone:
Email: *

( We will never sell or share your information with third parties. )

*Product:

Vertical Mill Ball Mill Kilns Crushers Parts

Clinker Grinding Station Cement Plant GGBS Production Line

*Question:

Products

More than 50 years’ manufacturing experiences of machinery focus on quality, sincerity spread.

Grinding Equipment

Calcining Equipment

Crushing Equipment

Benefication & Collection

Parts & Castings