Production Process
1. Wooden pattern Production
2. Molding
3. Pouring
4. First cleaning
5. Heat treatment – grinding (inspection)
6. Rough machining (inspection)-finishing machining (inspection)
7. Packing-delivering
The steel casting nodes made by us were applied to many domestic large-scale airports, stadiums etc. such as the second-phase project of Xinzheng International Airport, especially the use in Fuzhou Olympic Sport Center whose carrying capacity is maximum i
The fabrication route is governed by the provisions of the implemented Quality System ISO 9001: 2000. The standard documentation ensures the full traceability of every process step:
• Manufacturer test certificates according to DIN EN 10.204 § 3.1 including chemical composition, mechanical properties and non-destructive examination;
• Dimensional check supported with a “as-built“ sketch;
• Record of the heat treatment chart